AS9600AS10097 Pipeline Airtightness Equipment
AS9600AS10097 Pipeline Airtightness Equipment
Product Parameters

Theoretical artificial

1 piece

Reference equipment dimensions (L * W * H mm)

1700 * 800 * 2000 (excluding three color lights)

Product Related
Equipment process flow

1. Manually place 5 pipelines and press the start button

2. Lower the cylinder and tighten the pipeline

3. Insert the upper and lower plugs into the joint hole

4. Conduct resistance and leakage tests on the pipeline

5. Install 5 resistance test sensors

6. Conduct resistance testing on the pipeline

7. Feedback inspection results of indicator lights

8. Test completed, cylinder rising

9. Loosen the pipeline of the error prevention cylinder and manually label it

10. Take out the pipeline